The client
An established rental property management company responsible for a large residential portfolio.
Customer success | Rental property management
Overview
An established rental property management company responsible for a large residential portfolio.
A pipe break affected 77 units across five floors, for a total affected area of 6,495 sq. ft.
All 77 units were dried without demolition; 38 microbiological samples showed no evidence of mould.
The organization
This customer is an established rental property management company in the Greater Quebec City area, owning and managing a portfolio of residential buildings.
For the manager of such a portfolio, a major incident affecting dozens of units at once cannot be handled unit by unit without risking prolonged disruption for tenants. The scale of the intervention required close coordination with the insurer and a method capable of treating many units in parallel.
The challenges
A large-scale pipe break
A pipe break on the sixth floor caused water damage that spread across five floors of the building, affecting 77 units, including corridors, bedrooms, bathrooms and kitchens, for a total area of 6,495 sq. ft. The scale of the incident required an intervention capable of treating many occupied units in parallel.
Rigorous documentation required by the insurer
Each unit required a precise assessment, documented humidity monitoring and, ultimately, microbiological validation to provide a complete file for the insurer and building manager.
The solution
A large-scale deployment, unit by unit
Assek Technologies deployed its Secur-Air system across all 77 affected units. Axial fans, air injectors and flexible ducts were installed simultaneously in corridors and units. A humidity sensor was installed in every unit to track changes in the water content of materials in real time through the Secur software.
Complete microbiological validation
Once drying was complete, 38 microbiological samples were collected and analysed by Eurofins. The analyses showed no evidence of mould on the affected materials before the units were returned to service.
Emergency intervention adapted to the scale of the incident.
Drying with Secur-Air technology.
Humidity monitoring for each unit through the Secur software.
Detailed assessment, documented monitoring and microbiological validation.
The results
A major incident managed without interrupting rental operations
All 77 affected units were fully dried without demolition. Residual moisture was confirmed below the 15% moisture equivalent (WME) threshold throughout the building.
Across five floors, covering 6,495 sq. ft. of affected area.
Analysed by Eurofins, with no evidence of mould.
Despite the scale of the incident.
Residual moisture confirmed below this threshold.