How can water damage on a construction site be managed without delaying handover?

The construction challenge

Protect the schedule, not just dry the damage.

“What general contractors ask us for most often is not simply drying. It is a partner who understands the schedule as well as the water damage.”

Jordane Landry, Business Development Manager, Assek Technologies

They trust us

Why Assek

Why choose Assek for your construction projects and job sites?

Challenge

Uncontrolled water damage on a construction site directly translates into delayed handover and contractual penalties.

Assek benefit

Assess the damage to coordinate the response

Our thermographic assessment and moisture readings document the true extent of damage, even across multiple floors, so the response can be coordinated with the general contractor instead of causing a widespread work stoppage.

Challenge

Failing to meet the humidity or pressure conditions required by plans and specifications can compromise material installation or the certification of a sensitive area.

Assek benefit

Maintain the required conditions

Our environmental control maintains the required conditions, including a moisture content below 15% WME and relative humidity below 60%, with real-time containment, HEPA filtration and dehumidification.

Challenge

Rebuilding a claim file manually after a construction-site incident takes valuable time from your teams and complicates discussions with the owner.

Assek benefit

Document the response automatically

Every response is automatically documented in Secur, ready to support a change order or justify the release of a contractual holdback.

Challenge

A leak that reaches completed finishing work means rework that was not in the budget or schedule, and another deficiency to correct before provisional acceptance.

Assek benefit

Target high-risk areas

Our water damage prevention system targets high-risk areas and units already delivered during phased construction.

Challenge

Overseeing multiple active construction sites without centralized visibility forces repeated visits and calls to superintendents just to understand the situation at each site.

Assek benefit

Centralize construction-site oversight

Oblik brings all of your construction sites together in one platform, available at any time.

FAQs

Yes. A coordinated approach with the general contractor can treat affected areas while other trades continue structural and finishing work.

Not necessarily. A structured response coordinated with the job site, combined with non-destructive drying, can often recover time rather than postpone project handover.

It is the management of the conditions required by project plans and specifications, including humidity, temperature, pressure, and air quality. It can combine containment, ventilation, HEPA filtration, and real-time dehumidification.

Yes. Each response is documented in Secur with diagnosis, photos, and a final report that can support a change notice, holdback, or deficiency close-out.